In response, the local meteorological bureau has strengthened its earthquake-monitoring efforts by installing underwater seismometers.
作为反应,当地气象部门须加强海底地震仪的布设监测。
In this paper, it is introduced of underwater operating mission when installing petroleum drilling platform and medical guarantee for air diving and oxygen-helium diving.
文章介绍了石油钻井平台安装时的水下作业任务以及空气潜水和氮氧潜水医务保障情况。
This product has the characters of water and damp proof, inflexibility. It is the necessity of installing underwater electromotor and pump, and underground cables.
本产品用于深井电机、潜水泵、地下电缆等安装设备材料。绝缘防水、防潮、包扎后不开口,不脱落等特点。
应用推荐